8TH STREET over CLEAR CREEK TRIBUTARY

JUST W OF GRIFFITH ST · County 019, Colorado · Built 2014 · 1 Lanes · 408 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
GTWN-06-0.01-1A
Year Built
2014
Length
9.1 m (29.9 ft)
Max Span
7.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
408
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.