11TH STREET over CLEAR CREEK

JUST W OF ROSE ST · County 019, Colorado · Built 1960 · 2 Lanes · 363 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
GTWN-02-0.01-01
Year Built
1960
Reconstructed
1991
Length
12.3 m (40.4 ft)
Max Span
10.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
363
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.