SH 83 ML over ANTELOPE CREEK
10.9 MI N EL PASO- DOUGLA · County 035, Colorado · Built 1968 · 2 Lanes · 4,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.263775, -104.716244
This bridge is in worse condition than 87.5% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 58 years old.
Nearby Bridges
SH 83 ML over WEST CHERRY CREEK
Built 1968
RUSSELLVILLE ROAD over EAST CHERRY CREEK
Built 1996
RUSSELLVILLE ROAD over CHERRY CREEK TRIBUTARY
Built 2002
STEELE AVENUE over EAST CHERRY CREEK
Built 1990
SH 83 ML over CHERRY CREEK
Built 1948
COUNTY ROAD 13 over RUNNING CREEK
Built 1988
TOMICHI DRIVE over RUSSELLVILLE GULCH
Built 2004
COUNTY ROAD 98 over RUNNING CREEK
Built 1990
RUSSELLVILLE ROAD over RUSSELLVILLE GULCH
Built 1990
CO ROAD 80 | JONES over WEST CHERRY CREEK
Built 1992
Bridge Details
- Structure #
- G-18-H
- Year Built
- 1968
- Length
- 28 m (91.9 ft)
- Max Span
- 12 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,400
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $459,000
- Total Project Cost
- $688,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.