SH 83 ML over WEST CHERRY CREEK

10.4 MI N OF DOUGLAS-EL · County 035, Colorado · Built 1968 · 2 Lanes · 4,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
G-18-BC
Year Built
1968
Length
35.1 m (115.2 ft)
Max Span
15.5 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
4,400
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000
Total Project Cost
$196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.