I 25 ML SBND over EAST PLUM CREEK

0.6 MI. S. CASTLE ROCK BU · County 035, Colorado · Built 2010 · 4 Lanes · 41,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
G-17-DY
Year Built
2010
Length
64.8 m (212.6 ft)
Max Span
32 m
Width
20.6 m (67.6 ft)
Lanes
4
Daily Traffic
41,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.