PLUM CREEK PARKWAY over EAST PLUM CREEK | PED TR

JUST E OF I-25 · County 035, Colorado · Built 2009 · 5 Lanes · 31,996 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
CAS PLMCKPW-1.5
Year Built
2009
Length
62.6 m (205.4 ft)
Max Span
19.9 m
Width
28.7 m (94.2 ft)
Lanes
5
Daily Traffic
31,996
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.