SH 91 ML over CLIMAX MINE HAUL ROAD
.1 MI N LAKE/SUMMIT CO LI · County 117, Colorado · Built 1989 · 2 Lanes · 5,100 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
39.380869, -106.190919
This bridge is in worse condition than 58.7% of bridges in County 117. The average bridge in Colorado is 0 years old; this one is 37 years old.
Nearby Bridges
NO DATA ENTERED over NO DATA ENTERED
Built 2011
NO DATA ENTERED over RESOLUTION CREEK
Built 2011
NFSR 714.2 over EAGLE RIVER
Built 2005
NO DATA ENTERED over RESOLUTION CREEK
Built 1970
I 70 ML EBND over WEST TEN MILE CREEK
Built 1977
I 70 ML EBND over GULLER GULCH
Built 1977
I 70 ML EBND over STAFFORD GULCH
Built 1977
I 70 ML EBND over SMITH GULCH
Built 1977
SH 9 ML over PLATTE GULCH
Built 2023
SH 91 ML over I 70 ML
Built 1977
Bridge Details
- Structure #
- G-12-R
- Year Built
- 1989
- Length
- 14.4 m (47.2 ft)
- Max Span
- 14.4 m
- Width
- 35.4 m (116.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,100
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.