SH 6 FRONTAGE RD over I 70 ML
3.6 MI E OF PARACHUTE · County 045, Colorado · Built 1981 · 2 Lanes · 671 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.476994, -107.993447
This bridge is in worse condition than 31.7% of bridges in County 045. The average bridge in Colorado is 0 years old; this one is 45 years old.
Nearby Bridges
I 70 WBND over COTTONWOOD CREEK
Built 1981
I 70 EBND over COTTONWOOD CREEK
Built 1981
SH6 M S. FRNTGE.RD over COTTONWOOD CREEK SR
Built 1981
I 70 ML+FRONT RD over ALLENWATER CREEK
Built 1982
US 6 ML over DRAW SR
Built 1954
I 70 ML EBND over ACCESS RD RR SPUR
Built 1982
I 70 ML WBND over ACCESS RD & RR SPUR
Built 1982
Spencer Parkway over Draw
Built 1981
County Road 300 over Colorado River
Built 1977
I 70 ML WBND over RULISON CROSS ROAD
Built 1980
Bridge Details
- Structure #
- G-05-J
- Year Built
- 1981
- Length
- 136.7 m (448.5 ft)
- Max Span
- 48.8 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 671
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.