Spencer Parkway over Draw
300 Ft N Battlement Pkwy · County 045, Colorado · Built 1981 · 2 Lanes · 1,590 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.441692, -108.026719
This bridge is in worse condition than 9.6% of bridges in County 045. The average bridge in Colorado is 0 years old; this one is 45 years old.
Nearby Bridges
County Road 300 over Colorado River
Built 1977
Cardinal Way over Parachute Creek
Built 1982
CT RD 215/CROSSROA over UP RR AR
Built 1982
COUNTY ROAD 300 over I 70 ML
Built 1982
US 6 ML over PARACHUTE CREEK SR
Built 1934
I 70 ML EBND over PARACHUTE CREEK
Built 1982
I 70 ML WBND over PARACHUTE CREEK
Built 1982
I 70 ML EBND over ACCESS RD RR SPUR
Built 1982
I 70 ML WBND over ACCESS RD & RR SPUR
Built 1982
I 70 ML+FRONT RD over ALLENWATER CREEK
Built 1982
Bridge Details
- Structure #
- SPENCER PKWY
- Year Built
- 1981
- Length
- 43.9 m (144 ft)
- Max Span
- 21.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 1,590
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.