Palmer Dr over Spillway
0.1 West of Hogan Dr · County 069, Colorado · Built 2010 · 2 Lanes
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.519667, -105.070056
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 16 years old.
Nearby Bridges
HCL+PGL BRT Guide over Mail Creek
Built 2019
US 287 ML over FOSSIL CREEK
Built 1975
Boardwalk Drive over Larimer Co. Canal No. 2
Built 1982
Troutman Parkway over Larimer Co. Canal No. 2
Built 1985
Fossil Creek Pkwy. over Fossil Creek
Built 2001
Skysail Lane over Larimer Co. Canal No. 2
Built 1980
Landing Drive over Larimer Co. Canal No. 2
Built 1982
South LeMay Avenue over Fossil Creek
Built 1985
JFK Parkway over Larimer Co Canal No. 2
Built 1992
Mitchell Drive over Larimer Co. Canal No. 2
Built 1992
Bridge Details
- Structure #
- FCPALM-0.1-HOG
- Year Built
- 2010
- Length
- 18.3 m (60 ft)
- Max Span
- 3 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.