HCL+PGL BRT Guide over Mail Creek
100 ft S of W Co. Rd 38 · County 069, Colorado · Built 2019 · 2 Lanes · 295 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.523017, -105.080742
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 7 years old.
Nearby Bridges
Troutman Parkway over Larimer Co. Canal No. 2
Built 1985
Palmer Dr over Spillway
Built 2010
Boardwalk Drive over Larimer Co. Canal No. 2
Built 1982
Moss Creek Drive over Moss Creek
Built 1985
US 287 ML over FOSSIL CREEK
Built 1975
Landing Drive over Larimer Co. Canal No. 2
Built 1982
JFK Parkway over Larimer Co Canal No. 2
Built 1992
Skysail Lane over Larimer Co. Canal No. 2
Built 1980
Mitchell Drive over Larimer Co. Canal No. 2
Built 1992
Horsetooth Road over Larimer Co Canal No. 2
Built 2018
Bridge Details
- Structure #
- FCMAXG-0.1-HRMY
- Year Built
- 2019
- Length
- 51.3 m (168.3 ft)
- Max Span
- 23.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 295
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.