US 40 ML over DRAW

2.4 MI SE OF DEERTRAIL · County 005, Colorado · Built 1931 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-20-K
Year Built
1931
Length
21.3 m (69.9 ft)
Max Span
7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
300
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.