US 40 ML over DRAW
1.5 MI NW OF DEER TRAIL · County 005, Colorado · Built 2022 · 2 Lanes · 360 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.627139, -104.057917
This bridge is in worse condition than 30.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
US 40 ML over EAST BIJOU CREEK
Built 1966
I 70 ML EBND over I 70 BUSS RT
Built 1965
COUNTY ROAD 38 over E. BIJOU CREEK
Built 1965
I 70 ML WBND over I 70 BUSS RT
Built 1965
I 70 DEERTRAIL SPU over DRAW
Built 1965
I 70 ML over DRAW
Built 1965
EMERGENCY ACCESS over DRAINAGE DITCH
Built 2018
COUNTY RD 217 over FIRST CREEK
Built 1950
COUNTY ROAD 38 over MIDDLE BIJOU CREEK
Built 1987
I 70 ML EBND over EAST BIJOU CREEK
Built 1965
Bridge Details
- Structure #
- F-20-JA
- Year Built
- 2022
- Length
- 22.9 m (75.1 ft)
- Max Span
- 21 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 360
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $557,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.