US 40 ML over DRAW

1.5 MI NW OF DEER TRAIL · County 005, Colorado · Built 2022 · 2 Lanes · 360 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
F-20-JA
Year Built
2022
Length
22.9 m (75.1 ft)
Max Span
21 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
360
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$277,000
Total Project Cost
$557,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.