I225 ML SBND over ILIFF AVE

In Aurora · County 005, Colorado · Built 2005 · 3 Lanes · 61,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-17-HV
Year Built
2005
Length
62.7 m (205.7 ft)
Max Span
32 m
Width
22.9 m (75.1 ft)
Lanes
3
Daily Traffic
61,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.