SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF
JCT US 85 and SH 470 · County 005, Colorado · Built 2011 · 2 Lanes · 37,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.567172, -105.032383
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 15 years old.
Nearby Bridges
SH 470 ML WBND over S. ERICKSON BLVD.
Built 1984
US 85 TO C470 RAMP over ERICKSON BLVD.
Built 2012
SH 470 ML EBND over S. ERICKSON BLVD.
Built 1984
US 85 ML SBND over DAD CLARK GULCH
Built 2004
US 85 ML NBND over DAD CLARK GULCH
Built 2013
SH 470 ML WBND over SOUTH PLATTE RIVER
Built 2019
SH 470 ML EBND over SOUTH PLATTE RIVER
Built 2018
SH 470 ML over HIGHLINE CANAL
Built 1984
US 85 ML over MARCEY GULCH
Built 1948
MINERAL AVENUE over SOUTH PLATTE RIVER
Built 1988
Bridge Details
- Structure #
- F-16-YE
- Year Built
- 2011
- Length
- 526.9 m (1728.7 ft)
- Max Span
- 49.8 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 37,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $726,000
- Total Project Cost
- $1,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.