US 85 ML NBND over DAD CLARK GULCH
IN LITTLETON · County 005, Colorado · Built 2013 · 2 Lanes · 22,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.5731, -105.028786
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 13 years old.
Nearby Bridges
US 85 ML SBND over DAD CLARK GULCH
Built 2004
SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF
Built 2011
MINERAL AVENUE over SOUTH PLATTE RIVER
Built 1988
SH 470 ML WBND over S. ERICKSON BLVD.
Built 1984
SH 470 ML EBND over S. ERICKSON BLVD.
Built 1984
US 85 TO C470 RAMP over ERICKSON BLVD.
Built 2012
SH 470 ML over HIGHLINE CANAL
Built 1984
SH 470 ML EBND over SOUTH PLATTE RIVER
Built 2018
SH 470 ML WBND over SOUTH PLATTE RIVER
Built 2019
MINERAL AVE over HIGHLINE CANAL
Built 1981
Bridge Details
- Structure #
- F-16-FA
- Year Built
- 2013
- Length
- 34.5 m (113.2 ft)
- Max Span
- 33.5 m
- Width
- 19.5 m (64 ft)
- Lanes
- 2
- Daily Traffic
- 22,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $569,000
- Total Project Cost
- $854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.