SH 26 ML ALAMEDA over I 25 ML

IN DENVER I25 · County 031, Colorado · Built 2012 · 5 Lanes · 42,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-16-XU
Year Built
2012
Length
72.8 m (238.8 ft)
Max Span
35.1 m
Width
43.3 m (142.1 ft)
Lanes
5
Daily Traffic
42,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$618,000
Total Project Cost
$927,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.