I 25 ML over US 85 ML
IN DENVER · County 031, Colorado · Built 2013 · 8 Lanes · 172,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.706219, -104.996175
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 13 years old.
Nearby Bridges
I 25 ML over DRAINAGE DITCH
Built 2016
85 NB RMP TO I25 N over I25ML US 85ML RMPS
Built 2013
S. PLATTE RIVER DR over SOUTH PLATTE RIVER
Built 2015
SH 26 ML ALAMEDA over I 25 ML
Built 2012
SH 26 ML over SOUTH PLATTE RIVER
Built 1911
KENTUCKY AVE over S PLATTE RIVER
Built 2024
RAMP TO I25 SB over RTD ACCESS ROAD
Built 2024
RAMP TO I25 SB over S BROADWAY
Built 2024
I25 ML over BRDWY BNSF UPRR RTD LR
Built 2002
MISSISSIPPI AVE over SOUTH PLATTE RIVER
Built 1953
Bridge Details
- Structure #
- F-16-XS
- Year Built
- 2013
- Length
- 166.7 m (546.9 ft)
- Max Span
- 73.2 m
- Width
- 45.4 m (149 ft)
- Lanes
- 8
- Daily Traffic
- 172,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,139,000
- Total Project Cost
- $4,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.