US 40 ML over CHERRY CREEK

COLFAX / DOWNTOWN DENVER · County 031, Colorado · Built 1999 · 7 Lanes · 40,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-TR
Year Built
1999
Length
31.3 m (102.7 ft)
Max Span
29 m
Width
41.3 m (135.5 ft)
Lanes
7
Daily Traffic
40,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.