SPEER BLVD NB over CHERRY CREEK
SPEER BLVD AT LAWRENCE ST · County 031, Colorado · Built 1981 · 5 Lanes · 24,845 vehicles/day
Overall
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
39.746108, -105.000403
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 45 years old.
Nearby Bridges
LAWRENCE STREET over CHERRY CREEK
Built 1958
Larimer Street over Cherry Creek
Built 2023
ARAPAHOE ST over CHERRY CREEK
Built 1957
MARKET STREET over CHERRY CREEK
Built 1985
S.B. SPEER BLVD over BASE FILL MATERIAL
Built 1957
BLAKE ST over CHERRY CREEK
Built 1984
WAZEE ST over CHERRY CREEK
Built 1985
LAWRENCE STREET over TABOR CENTER UTILITY COR
Built 1984
CHAMPA STREET over CHERRY CREEK
Built 1976
STOUT STREET over CHERRY CREEK
Built 1985
Bridge Details
- Structure #
- D-01-CC-060
- Year Built
- 1981
- Length
- 73.2 m (240.2 ft)
- Max Span
- 34.4 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 5
- Daily Traffic
- 24,845
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,725,000
- Total Project Cost
- $1,898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.