RAMP TO US 85 NBND over RAMP TO US 85 NBND[NE] R

2.09 MI N OF JCT US 285 · County 031, Colorado · Built 1986 · 1 Lanes · 38,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-PM
Year Built
1986
Length
192.8 m (632.5 ft)
Max Span
39 m
Width
7 m (23 ft)
Lanes
1
Daily Traffic
38,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.