US 85 ML SBND over SOUTH PLATTE RIVER

IN DENVER ON SO SANTA FE · County 031, Colorado · Built 1972 · 3 Lanes · 44,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-16-IL
Year Built
1972
Length
65.4 m (214.6 ft)
Max Span
32.2 m
Width
12.9 m (42.3 ft)
Lanes
3
Daily Traffic
44,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.