US 40 ML over APEX GULCH

COLFAX AT I 70 EB RAMP · County 059, Colorado · Built 1968 · 5 Lanes · 24,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
F-16-IX
Year Built
1968
Length
8.7 m (28.5 ft)
Max Span
4.1 m
Width
36.3 m (119.1 ft)
Lanes
5
Daily Traffic
24,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.