I 70 ML WBND over US 40 ML
3.6 MI W OF JCT SH 58 · County 059, Colorado · Built 1969 · 3 Lanes · 35,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.730736, -105.170828
This bridge is in worse condition than 94% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 57 years old.
Nearby Bridges
I 70 ML EBND over US 40 ML
Built 1969
I70 ML over APEX GULCH
Built 1968
I 70 ML WBND over OLD GOLDEN ROAD
Built 1968
I 70 ML EBND over MOSS STREET W 7TH AVE
Built 1969
I 70 ML WBND over MOSS STREET W 7TH AVE
Built 1969
I 70 ML EBND over OLD GOLDEN ROAD
Built 1968
RESEARCH ROAD over LENA GULCH
Built 2012
SOUTH GOLDEN ROAD over LENA GULCH TRIBUTARY
Built 1978
US 40 ML over APEX GULCH
Built 1968
OLD GOLDEN ROAD over LENA GULCH
Built 2014
Bridge Details
- Structure #
- F-16-HI
- Year Built
- 1969
- Length
- 115.6 m (379.3 ft)
- Max Span
- 41 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 35,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.