I 70 ML WBND over WEST 20TH AVE
2 MI W OF JCT SH 58 · County 059, Colorado · Built 1968 · 3 Lanes · 45,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.747369, -105.151019
This bridge is in worse condition than 94% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 58 years old.
Nearby Bridges
I 70 ML EBND over WEST 20TH AVE
Built 1968
COLE BOULEVARD over LENA GULCH
Built 1975
DENVER WEST BLVD over I 70 ML
Built 1996
COLE BLVD | DENVER over LENA GULCH
Built 1974
20TH AVENUE over LENA GULCH
Built 1994
27TH AVENUE over MAPLE GROVE RES SPLWY
Built 1989
I 70 ML WBND over 32ND AVE
Built 2023
I 70 ML EBND over 32ND AVE
Built 2023
I70 WB OFFRAMP over 32ND AVE
Built 2021
ISABELL STREET over LENA GULCH
Built 1994
Bridge Details
- Structure #
- F-16-HK
- Year Built
- 1968
- Length
- 43.6 m (143 ft)
- Max Span
- 20 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 45,500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,224,000
- Total Project Cost
- $1,836,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.