I 70 ML EBND over 32ND AVE
5.0 MI E of C-470 · County 059, Colorado · Built 2023 · 3 Lanes · 45,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.761633, -105.142842
This bridge is in worse condition than 40.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I 70 ML WBND over 32ND AVE
Built 2023
I70 WB OFFRAMP over 32ND AVE
Built 2021
32ND AVENUE over LENA GULCH
Built 1975
I70 ML over 40TH AVE.
Built 2009
20TH AVENUE over LENA GULCH
Built 1994
27TH AVENUE over MAPLE GROVE RES SPLWY
Built 1989
SH 58 RAMP over I70ML/ SH58 ML/CLR CRK
Built 2008
I 70 ML WBND over CLEAR CREEK
Built 1968
I 70 ML EBND over CLEAR CREEK
Built 1968
YOUNGFIELD STREET over CLEAR CREEK
Built 1988
Bridge Details
- Structure #
- E-16-HEA
- Year Built
- 2023
- Length
- 53.3 m (174.9 ft)
- Max Span
- 25.8 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 3
- Daily Traffic
- 45,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.