23RD AVENUE over I 25 ML

IN DENVER · County 031, Colorado · Built 1952 · 2 Lanes · 11,261 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
F-16-DA
Year Built
1952
Length
78 m (255.9 ft)
Max Span
23.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
11,261
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$408,000
Total Project Cost
$613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.