SPEER BLVD SBND over I 25 ML

IN DENVER · County 031, Colorado · Built 1952 · 3 Lanes · 23,671 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
E-16-EO
Year Built
1952
Length
78.5 m (257.5 ft)
Max Span
25.3 m
Width
14.1 m (46.3 ft)
Lanes
3
Daily Traffic
23,671
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,961,000
Total Project Cost
$5,941,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.