RAMP TO I 70 EBND over CLEAR CREEK R

3.4 MI E. OF JCT SH 103 · County 019, Colorado · Built 1999 · 1 Lanes · 23,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-15-BZ
Year Built
1999
Length
68.6 m (225.1 ft)
Max Span
29.6 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
23,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.