I 70 ML WBND over US 6 CLEAR CREEK
8.7 MI W OF JCT SH 74 · County 019, Colorado · Built 1959 · 2 Lanes · 23,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.7459, -105.438736
This bridge is in worse condition than 94.8% of bridges in County 019. The average bridge in Colorado is 0 years old; this one is 67 years old.
Nearby Bridges
RAMP TO US 6 ML over CLEAR CREEK R
Built 1959
I 70 ML EBND over CO RD CLEAR CREEK
Built 1974
US 40 ML over CLEAR CREEK
Built 1973
RAMP TO I 70 EBND over CLEAR CREEK R
Built 1999
I 70 ML over CLEAR CREEK
Built 1999
I 70 FRONTAGE RD over CLEAR CREEK SR
Built 1936
US 6 ML over CLEAR CREEK
Built 1984
I 70 ML over COUNTY ROAD 314
Built 1999
US 6 ML over CLEAR CREEK
Built 1984
I 70 ML WBND over CLEAR CREEK
Built 1961
Bridge Details
- Structure #
- F-15-BL
- Year Built
- 1959
- Length
- 165.3 m (542.3 ft)
- Max Span
- 29.3 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 23,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,919,000
- Total Project Cost
- $4,378,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.