SH 103 ML over CLEAR CREEK

IN IDAHO SPRINGS · County 019, Colorado · Built 1958 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
F-14-G
Year Built
1958
Length
33.2 m (108.9 ft)
Max Span
10.7 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.