SH 103 ML over I 70 ML

IN IDAHO SPRINGS · County 019, Colorado · Built 2015 · 3 Lanes · 2,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-14-AA
Year Built
2015
Length
60.2 m (197.5 ft)
Max Span
29.3 m
Width
18.5 m (60.7 ft)
Lanes
3
Daily Traffic
2,300
Material
Other
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000
Total Project Cost
$406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.