I 70 FRONTAGE RD over RED SANDSTONE CREEK SR

IN VAIL · County 037, Colorado · Built 1984 · 1 Lanes · 16,349 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F-11-Q
Year Built
1984
Length
15.5 m (50.9 ft)
Max Span
15 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
16,349
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$351,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.