I 70 ML WBND over VAIL ROAD

IN VAIL · County 037, Colorado · Built 1969 · 2 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F-11-N
Year Built
1969
Length
31.1 m (102 ft)
Max Span
11.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
14,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.