HIGHWAY 110 over SPRING CREEK
1.9 MI E OF ELLICOTT HWY · County 041, Colorado · Built 1935 · 2 Lanes · 90 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.939669, -104.352167
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 91 years old.
Nearby Bridges
JUDGE ORR ROAD over SPRING CREEK
Built 1950
JUDGE ORR ROAD over BRACKETT CREEK
Built 2000
SOAPWEED ROAD over SPRING CREEK
Built 1965
CALHAN HIGHWAY over STEELS FORK CREEK
Built 1984
FALCON HIGHWAY over SQUIRREL CREEK
Built 1989
SCOTT ROAD over BIG SPRING CREEK
Built 1994
LOG ROAD over SQUIRREL CREEK
Built 1997
CALHAN ROAD over SPRING CREEK
Built 1992
ELLICOTT HWY over SQUIRREL CREEK
Built 2023
ELLICOTT HIGHWAY over BLACK SQUIRREL CK TRIB.
Built 1996
Bridge Details
- Structure #
- EPC0286-04.87
- Year Built
- 1935
- Length
- 17.2 m (56.4 ft)
- Max Span
- 5.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $138,000
- Total Project Cost
- $152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.