E-470 EB over Peoria Street

1.71 MI FROM I-25 · County 035, Colorado · Built 1990 · 3 Lanes · 25,045 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E-470-1.71A
Year Built
1990
Reconstructed
2004
Length
62.1 m (203.7 ft)
Max Span
30.3 m
Width
22.5 m (73.8 ft)
Lanes
3
Daily Traffic
25,045
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.