E-470 WB over Cottonwood Ck & Jamaica

0.47 MI FROM I 25 · County 035, Colorado · Built 1990 · 3 Lanes · 26,951 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-0.47B
Year Built
1990
Length
99.5 m (326.4 ft)
Max Span
49.3 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
26,951
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.