I76 ML & RAMP over SECOND CREEK

BTWN JCT SH2 AND 120 AVE · County 001, Colorado · Built 2003 · 6 Lanes · 32,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-UK
Year Built
2003
Length
25.6 m (84 ft)
Max Span
24.3 m
Width
50.7 m (166.3 ft)
Lanes
6
Daily Traffic
32,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.