POTOMAC STREET over OBRIAN CANAL
0.2 MILE NORTH OF SH 2 · County 001, Colorado · Built 1940 · 1 Lanes · 190 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
2
Critical
Superstructure
3
Serious
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 2 | Critical |
| Superstructure | 3 | Serious |
| Substructure | 4 | Poor |
Location
39.903847, -104.827822
This bridge is in worse condition than 99.4% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 86 years old.
Nearby Bridges
SH 2 ML over OBRIAN CANAL
Built 1999
FARM ACCESS ROAD over BURLINGTON CANAL AR
Built 1971
FARM ACCESS ROAD over BURLINGTON CANAL AR
Built 1971
I 76 ML over BURLINGTON CANAL
Built 1957
SH 2 ML over BNSF RR
Built 1999
SH 2 ML over I 76 ML
Built 1999
I76 ML & RAMP over SECOND CREEK
Built 2003
SH 2 ML over SECOND CREEK
Built 1999
120TH AVENUE over SECOND CREEK
Built 2001
120TH AVE. over I76 ML/BNSF/CANAL/AC RD
Built 2002
Bridge Details
- Structure #
- COMC-07-0.2-01
- Year Built
- 1940
- Length
- 20.2 m (66.3 ft)
- Max Span
- 18.7 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 190
- Material
- Steel
- Design
- Truss - Thru
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,335,000
- Total Project Cost
- $1,669,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.