I 270 EBND over I76 RAMP SH224 CLEAR CRK
1 mile East of I-25 · County 001, Colorado · Built 1999 · 2 Lanes · 37,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.826164, -104.969444
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 27 years old.
Nearby Bridges
270SB _76EB RMP Y over I76 RMPS SH224 CLR.CRK.
Built 2010
I270 WBND ML over I76 RAMP SH224 CLEAR CRK
Built 1998
I76 ML WBND over I 270 ML
Built 2003
I76 ML EBND over I 270 ML
Built 2003
I76 WB ML over I76 EB ON RAMP FROM I270
Built 2003
I76 EB ML over I76 WB ON RAMP FROM I270
Built 2003
I76 ONRMP FROM 270 over I270B RAMP TO I76 WB
Built 2003
I 270 ML WBND over WASHINGTON STREET
Built 1998
I 270 EBND ML over WASHINGTON STREET
Built 2003
WASHINGTON ST over CLEAR CREEK
Built 1970
Bridge Details
- Structure #
- E-17-QI
- Year Built
- 1999
- Length
- 249.6 m (818.9 ft)
- Max Span
- 46.9 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 2
- Daily Traffic
- 37,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.