I76 ONRMP FROM 270 over I270B RAMP TO I76 WB

NE OF JCT I25 · County 001, Colorado · Built 2003 · 1 Lanes · 84,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
E-17-QD
Year Built
2003
Length
48.3 m (158.5 ft)
Max Span
47.5 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
84,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.