W 62nd Ave over I 76 ML
1 MI W OF JCT I25 & I-70 · County 001, Colorado · Built 1992 · 2 Lanes · 3,569 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.810889, -104.997678
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 34 years old.
Nearby Bridges
I 76 ML WBND over PECOS STREET
Built 1989
I 76 ML EBND over PECOS STREET
Built 1989
PECOS STREET over CLEAR CREEK
Built 1989
SH 53 ML over 64TH ST DRAIN CANAL
Built 1993
OSAGE STREET over BNSF MAINLINE/LIGHT RAIL
Built 2012
EB76 RMP TO I25 NB over SH 53 ML
Built 1993
I 76 EBND ML over SH 53 ML-BROADWAY
Built 1993
I76 EB RAMP TO I25 over SH 53 ML R
Built 1993
I 76 ML WBND over SH 53 ML-BROADWAY
Built 1993
I76RAMP OVER BRDWY over SH 53 ML-BROADWAY R
Built 1993
Bridge Details
- Structure #
- E-17-OT
- Year Built
- 1992
- Length
- 74.5 m (244.4 ft)
- Max Span
- 37 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,569
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.