I76 EB RAMP TO I25 over SH 53 ML R

.4 MI W OF JCT I76 Ramp · County 001, Colorado · Built 1993 · 1 Lanes · 98,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-OP
Year Built
1993
Length
85 m (278.9 ft)
Max Span
30.5 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
98,000
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.