I 70 ML WBND over HIGHLINE CANAL
0.2 Mi E OF TOWER ROAD · County 001, Colorado · Built 1964 · 3 Lanes · 17,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.757847, -104.767781
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 62 years old.
Nearby Bridges
I 70 ML EBND over HIGHLINE CANAL
Built 1964
TOWER ROAD over I 70 ML
Built 1989
22ND AVENUE over LOCAL DRAINAGE
Built 1981
I 70 ML EBND over SMITH ROAD UP RR
Built 2014
I 70 ML WBND over SMITH ROAD UP RR
Built 2014
TOWER ROAD over LOCAL DRAINAGE
Built 1981
AIRPORT BLVD over I-70
Built 1993
US 40 ML WBND over SAND CREEK
Built 2013
US 40 ML EBND over SAND CREEK
Built 2013
NB AIRPORT BLVD over SAND CREEK
Built 1991
Bridge Details
- Structure #
- E-17-IY
- Year Built
- 1964
- Length
- 11 m (36.1 ft)
- Max Span
- 9.4 m
- Width
- 14 m (45.9 ft)
- Lanes
- 3
- Daily Traffic
- 17,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $119,000
- Total Project Cost
- $131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.