I 70 ML WBND over SMITH ROAD UP RR
4.3 MI E OF JCT I 225 · County 001, Colorado · Built 2014 · 2 Lanes · 17,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.752914, -104.753817
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 12 years old.
Nearby Bridges
I 70 ML EBND over SMITH ROAD UP RR
Built 2014
I 70 ML EBND over HIGHLINE CANAL
Built 1964
I 70 ML WBND over HIGHLINE CANAL
Built 1964
TOWER ROAD over I 70 ML
Built 1989
TOWER ROAD over LOCAL DRAINAGE
Built 1981
22ND AVENUE over LOCAL DRAINAGE
Built 1981
I 70 ML EBND over US 40 WBND
Built 1957
PICADILLY ROAD over FIRST CREEK
Built 1960
US 40 ML WBND over SAND CREEK
Built 2013
US 40 ML EBND over SAND CREEK
Built 2013
Bridge Details
- Structure #
- E-17-AEK
- Year Built
- 2014
- Length
- 131.3 m (430.8 ft)
- Max Span
- 48.4 m
- Width
- 19.2 m (63 ft)
- Lanes
- 2
- Daily Traffic
- 17,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.