I 70 ML EBND over DAHLIA STREET

DENVER · County 031, Colorado · Built 2020 · 6 Lanes · 65,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-AFG
Year Built
2020
Length
28 m (91.9 ft)
Max Span
26.2 m
Width
28.8 m (94.5 ft)
Lanes
6
Daily Traffic
65,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.