WASHINGTON STREET over SH 58 ML
IN GOLDEN · County 059, Colorado · Built 2010 · 5 Lanes · 11,415 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.760103, -105.225583
This bridge is in worse condition than 40.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 16 years old.
Nearby Bridges
SH 58 ML over FORD STREET WASH
Built 2013
7TH PLACE over TUCKER GULCH
Built 1966
1ST STREET over TUCKER GULCH | TUCKER GU
Built 1978
10TH STREET over TUCKER GULCH
Built 1966
WASHINGTON AVENUE over CLEAR CREEK
Built 2003
FORD STREET over CLEAR CREEK
Built 1999
US 6 ML over CLEAR CREEK
Built 1999
JOSEPH CIRCLE over TUCKER GULCH
Built 2005
19TH ST over US 6 ML
Built 2017
SH 93 ML over TUCKER GULCH
Built 1996
Bridge Details
- Structure #
- E-16-XR
- Year Built
- 2010
- Length
- 43 m (141.1 ft)
- Max Span
- 20.9 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 5
- Daily Traffic
- 11,415
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,949,000
- Total Project Cost
- $2,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.