SH 58 ML over FORD STREET WASH

IN GOLDEN · County 059, Colorado · Built 2013 · 6 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-16-HG
Year Built
2013
Length
68.6 m (225.1 ft)
Max Span
28.2 m
Width
28.3 m (92.8 ft)
Lanes
6
Daily Traffic
18,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,163,000
Total Project Cost
$4,744,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.