88TH ST. over US 36 ML

3.5 MI W. OF SH 121 · County 013, Colorado · Built 2000 · 2 Lanes · 8,157 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-16-QU
Year Built
2000
Length
99 m (324.8 ft)
Max Span
48.9 m
Width
17.5 m (57.4 ft)
Lanes
2
Daily Traffic
8,157
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.