US 36 ML over RAMP B & BIKEPATH

1.5 MI E. OF SUPERIOR · County 014, Colorado · Built 2001 · 6 Lanes · 68,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-16-HK
Year Built
2001
Reconstructed
2013
Length
17.3 m (56.8 ft)
Max Span
16.2 m
Width
41.1 m (134.8 ft)
Lanes
6
Daily Traffic
68,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.